Chevron Green Consultancy has been supporting Chevron Green Services on a vegetation clearance job in Sussex.
Throughout the de-vegetation works, Chevron Green Consultancy have provided an Ecological Clerk of Works (ECoW) on site.
The vegetation clearance is underway to provide room for trial holes to be dug. These trial holes are used to assess soil environment and groundwater conditions.
Due to the location of the site, the ECoW is there to minimise the risk to reptiles.
Prior to works starting a fingertip search was taken of the area. On this occasion, no reptiles were found.