Skip to main content
CGC conduct Preliminary Ecological Assessments along the railway line
CGC conduct Preliminary Ecological Assessments along the railway line
Published on 21 Jun 2023

Over the winter, our Chevron Green Consultancy Environment team members were working on Preliminary Ecological Assessments (PEAs) in Hampshire and Dorset.

These PEAs were along the railway lines to identify whether planned works along the line would impact protected habitats, protected species or designated sites. The PEAs were also to provide recommendations for further surveys and mitigation advice.

The PEAs formed an essential part of the works preparation to ensure that the planned works are undertaken in accordance with EU and UK legislation. Overall, eight sites were surveyed. Each site took half a day, with one of our ecologists and a railway supervisor accompanying them.

Get in touch to learn how Chevron Green Consultancy can support your rail or infrastructure projects.

Find out more about our environmental consultancy services  

Our certifications, accreditations and memberships

BSI ISO 9001
BSI ISO 14001
ISO-44001
BSI ISO 45001
BSI ISO 50001
PAS 2080
NHSS
Builders Profile
Grown in Britain
Construction Line
CHAS
SCSS
SSIP
BFRS
Achilles UVDB Certified